Pillora
Premium Modular
Pill Organiser
A strategic route to market plan for Pillora — a design-led, premium daily supplement organiser. This document outlines the RTMP Launch Phase, including full technical assessment, DFM review, indicative costing, and a 30–40 page development roadmap.
About the Project
Pillora is a premium modular daily pill and supplement organiser positioned within the health, wellness, and lifestyle category. The product is designed to replace dated, clinical pill organisers with a refined, design-led alternative that removes stigma and supports modern supplement routines.
The product consists of a rigid outer chassis — injection moulded ABS or polycarbonate inspired by a sunglass case silhouette — housing 7 interchangeable food-grade silicone internal pods with integrated friction-fit lids. Each pod is lettered for the day of the week and features magnetic base alignment for precise positioning within the chassis. Target dimensions are approximately 200mm x 60mm x 45mm.
Key technical requirements include food-grade platinum-cured silicone (LFGB or FDA compliant), embedded neodymium magnets, a friction-fit lid mechanism rated to 10,000 open/close cycles, drop test performance from 1 metre, and dishwasher-safe silicone components. The product must be suitable for one-handed operation with a minimum 3–5 year daily-use lifecycle.
The target user is women aged 35–75 in the health and wellness space, with a retail price point of AUD $35–$75. Sales channels include Shopify, Amazon, and social/influencer marketing. The product sits in the mid-premium consumer wellness segment.
The project is currently at idea/concept stage. No CAD files or engineering documentation exist. The client holds a detailed design brief, a manufacturer specification sheet, and preliminary 2D reference drawings. Full product development is required from industrial design and engineering through to mass production manufacture.
Production Targets
| Prototype Quantity | 3 units |
| First Production Run | 3,000 units |
| Year 1 Volume Target | ~5,000 units |
| Target Retail Price | AUD $35–$75 |
| Target Unit Cost | $7.50 USD (to be validated) |
| Target Timeline to Production | 9–12 months |
| Funding Status | Secured |
Deliverables & Scope
The Route to Market Plan (RTMP) is a paid strategic planning engagement that precedes any development work. It maps the exact pathway from the current concept stage through to mass production manufacture.
Duration: Approximately 4–6 working weeks from confirmation.
- Phase timelines and phase management costs
- Shield Works resource allocations and core deliverables across each phase
- Industrial design and 3D CAD development planning
- Sampling, development, and design optimisation (full DFM/DFA)
- Injection moulding assessment for the rigid chassis and silicone pod components
- Magnetic alignment and friction-fit mechanism feasibility
- Prototyping and pilot run manufacture planning
- Packaging development scope (rigid telescope box with moulded insert)
- Mass production pathway and future scaled production goals
5 core deliverables
Shield Works R&D
What Is Not Included
The RTMP Launch Phase fee covers all five deliverables listed above, including all research, technical assessment, reporting, and coordination. The following are excluded and would be scoped and costed within the RTMP document itself.
Industrial design, 3D CAD development, and engineering work
Silicone moulding development and tooling for internal pods
Injection moulding tooling for the outer chassis and lid
Prototyping, sampling, and physical testing
Magnetic component sourcing and integration
Food-grade certification and compliance testing (LFGB, FDA)
Packaging development, tooling, and production
Shipping costs for physical samples or prototypes
Mass production and assembly costs
Commercial Terms
| Stage | Fee | Payment Trigger |
|---|---|---|
| RTMP Launch Phase | $3,500 USD | Payable in full on project confirmation |